Register Now
Request Demo
    Back to Blog

    The 48-Hour Deadline: Intertape Polymer Group Beats Walmart GDSN Deadline | Salsify

    by: Salsify
    The 48-Hour Deadline: Intertape Polymer Group Beats Walmart GDSN Deadline | Salsify

    Intertape Polymer Group, which develops and manufactures tapes, films, and fabrics for aerospace, automotive, construction, marine, and other specialty markets, needed to list several in-store items with Walmart.

    The problem? It lacked a Global Data Synchronization Network (GDSN) data pool — a critical requirement for Walmart’s in-store listings. Download our case study to learn how its team beat its 48-hour deadline to set up a GDSN data pool and list its products to Walmart.

    Salsify Intertape Polymer Group Case Study

    Download Case Study

     

    Salsify

    ​​Salsify drives results for customers worldwide, empowering them to win on the digital shelf.